Demo Festival

Meadowline Foundation · Sun 15 Nov

What your client sees
A sample event, shown the way your client sees it in the portal. Names and figures are invented. Show day in 21 days.

This is your client's side: one project, through one link. The platform itself, with the dashboard, the budget, the planning, the crew and the rundown of a whole season, you can explore without an account.

Try the rundownStart free trial

The budget

Per stage, with the status and what the client pays. Open a category to see its lines.

Total client price

€ 60,824.00

Main Stage

€ 34,990.00

Second Stage

€ 6,640.00

Project-wide

€ 19,194.00

Main Stage

CategoryClient price
1
SoundConfirmed
  • Line array PA, show day1 × € 6,800.00 = € 6,800.00
  • Monitor system with eight wedges1 × € 2,400.00 = € 2,400.00
  • Sound engineers, two days4 × € 520.00 = € 2,080.00
€ 11,280.00
2
LightingConfirmed
  • Lighting design and programming1 × € 1,800.00 = € 1,800.00
  • Moving heads24 × € 85.00 = € 2,040.00
  • Lighting crew, two days4 × € 480.00 = € 1,920.00
€ 5,760.00
3
VideoSupplier chosen
  • LED wall, 6 by 3 metres1 × € 5,200.00 = € 5,200.00
  • Cameras for the side screens3 × € 450.00 = € 1,350.00
€ 6,550.00
4
Staging and riggingConfirmed
  • Stage deck, 12 by 10 metres, with roof1 × € 7,400.00 = € 7,400.00
  • Rigging points16 × € 95.00 = € 1,520.00
  • Build crew, per person8 × € 310.00 = € 2,480.00
€ 11,400.00
Subtotal€ 34,990.00

Second Stage

CategoryClient price
1
SoundSupplier chosen
  • Compact PA with monitors1 × € 2,900.00 = € 2,900.00
  • Sound engineer, show day1 × € 520.00 = € 520.00
€ 3,420.00
2
LightingQuotes received
  • Basic rig with ten fixtures1 × € 1,650.00 = € 1,650.00
  • Lighting operator, show day1 × € 480.00 = € 480.00
€ 2,130.00
3
BacklineConfirmed
  • Drum kit and amplifiers1 × € 640.00 = € 640.00
  • Backline tech, show day1 × € 450.00 = € 450.00
€ 1,090.00
Subtotal€ 6,640.00

Project-wide

CategoryClient price
1
PowerConfirmed
  • Generator 250 kVA, three days2 × € 1,350.00 = € 2,700.00
  • Cables and distribution boards1 × € 980.00 = € 980.00
  • Power engineer on standby, per day3 × € 410.00 = € 1,230.00
€ 4,910.00
2
SecurityConfirmed
  • Security officers, per shift18 × € 245.00 = € 4,410.00
  • Crowd managers, show day2 × € 390.00 = € 780.00
€ 5,190.00
3
Crew cateringSupplier chosen
  • Lunches, three days146 × € 14.00 = € 2,044.00
  • Dinners, two days97 × € 21.00 = € 2,037.00
€ 4,081.00
4
ToiletsQuotes received
  • Toilet units12 × € 165.00 = € 1,980.00
  • Cleaning team, per day3 × € 520.00 = € 1,560.00
€ 3,540.00
5
Hotel and travelSupplier chosen
  • Hotel rooms, per night7 × € 129.00 = € 903.00
  • Flights for the artists2 × € 285.00 = € 570.00
€ 1,473.00
Subtotal€ 19,194.00

The production

Equipment, catering, comms, power, hotels and flights — in one place instead of in six sheets

Equipment

  • 1× Boom lift, 12 metres · Sat 14 Nov · Liftway Rental
  • 2× Forklift · Sat 14 Nov · Liftway Rental
  • 1× Telehandler · Mon 16 Nov · Liftway Rental

Catering

  • Sat 14 Nov · Build crew · 40 lunch (6 veg) · 24 dinner (4 veg)
  • Sun 15 Nov · Crew and artists · 73 lunch (11 veg) · 73 dinner (11 veg)
  • Mon 16 Nov · Strike crew · 33 lunch (5 veg)

Comms

  • Stage manager, Main Stage · Handheld radio · Channel 1 - Production
  • Stage manager, Second Stage · Handheld radio · Channel 1 - Production
  • Production office · Handheld radio · Channels 1 and 2
  • Security, main gate · Handheld radio · Channel 3 - Security

Power

  • 2× 3x63A three-phase, FOH and stage · Main Stage
  • 1× 3x32A three-phase · Second Stage
  • 6× Site lighting towers · Project-wide

Flights

  • Nova Reyes · Artist, headliner → Amsterdam (AMS) · Sat 14 Nov
  • Mara Sonn · Artist → Amsterdam (AMS) · Sat 14 Nov

Hotel

  • Nova Reyes · Artist, two nights
  • Mara Sonn · Artist, one night
  • Velvet Harbour · Band, four rooms, one night

The rundown

Sun 15 Nov · 19:30

Every cue of the show, with the instructions per department. The same show runs in the rundown demo.

Main Stage

CueTimeItemDuration
119:30House openSecurity: Pit barrier check signed off before the gates release. Two stewards stay on the front rail until the opening act is done. · Audio: Walk-in playlist at -12 dB, channels 31/32 · Lighting: House wash at 60%, movers parked30:00
220:00Site announcementPlayout: Roll SITE_SAFETY_EN_NL_v3, 2:48, hard out · Audio: Duck the walk-in music under the announcement, back up on the tail3:00
320:03Velvet HarbourAudio: Band on 1-24, monitor mix A, no in-ears · Lighting: Cue stack VH1. No strobes anywhere in this set, it is in the rider. · Video: IMAG only, no playback content35:00
420:38Changeover 1Backstage/Crew: Stage right clear for the riser, four hands15:00
520:53Mara SonnAudio: Playback stems on 25/26, timecode from stage left · Lighting: Cue stack MS-2 armed on TC. If the feed drops, go manual on the chorus. · GFX: Lower third at the top of the set only45:00
621:38Changeover 2Backstage/Crew: Drum kit B on the wheeled riser · Rigging: Upstage truss down to 4 m for the banner swap, then back to trim20:00
721:58Sponsor reel + host segmentPlayout: SPONSOR_REEL_v4, 1:30, hard out. v3 is off the server. · Audio: Host handheld A live, spare B on standby at stage right · Lighting: Host special stage right, house to 40% · GFX: Sponsor bumper on the side screens, hold it until the host walks off10:00
822:08Kite CommitteeAudio: Two extra wedges downstage centre, monitors are briefed · Special FX: Low fog from the top of the set, two hazers · Lighting: Cue stack KC4, blinders on the last two songs50:00
922:58Changeover 3Catering: Crew meal window opens for the day shift, 30 minutes20:00
1023:18Sunset break - DJ setAudio: DJ booth on 27/28, festival limiter stays in · Lighting: Golden hour look, no movers into the crowd30:00
1123:48Host: crowd momentVideo: Crowd cameras 3 and 4 to the screens, hold the wide · Lighting: House lights to 20% so the phones read on camera7:00
1223:55The Dust RadioAudio: In-ears, split from the band's own rack · Rigging: Nothing moves during this set, the motors are locked out · Lighting: Cue stack TDR, haze up before the first song1:00:00
1300:55Changeover 4Pyro: The arming window opens here and nowhere else. Radio call on channel 1 when the pods are live, nobody within five metres of the upstage pods until the all-clear. · Security: Upstage area cleared and held until the all-clear25:00
1401:20Nova Reyes (headline)Pyro: Gerbs on the last chorus, on the showcaller's go only · Special FX: Confetti on the final chord, both stage cannons · Lighting: Cue stack NR1 on TC, manual backup on the desk · Audio: House limiter to show setting, FOH has the curfew clock1:20:00
1502:40EncoreLighting: Blackout, hold for eight seconds, then the encore look15:00
1602:55Curfew - house musicAudio: House music at -18 dB, everything off at curfew · Lighting: Work lights up on the stage, house to 100% · Security: Open the north gate for the outflow before the last song ends · Decor: Banner strike starts once the field is clear, not before10:00

Project-wide

CueTimeItemDuration
A19:30Site openSecurity: Gate count every fifteen minutes to the production office · Catering: Crew breakfast closes at site open1:00:00
B20:30Site announcement, all stagesPlayout: Same file on every stage, roll on the showcaller's go3:00
C20:33Curfew, site closesSecurity: Both outflow gates open, cart route closed · Other: Lost and found moves to the main entrance30:00

Your own project

That was an example. Your own project looks exactly like this: the same budget, the same planning, the same rundown — and the same kind of link for your client.

30 days · up to 3 projects · no credit card

Sample event · invented names and figures · dates move with today · amounts excl. VAT